The most expensive mistake when buying equipment is not overpaying. It is the unit standing unloaded on the site when somebody works out that the safety zone runs into the footpath.

Andrzej Bolechowicz · updated August 10, 2026 · reading time 8 min

The unit has arrived, the courier has unloaded the pallet, and the packaging contains the instructions and nothing else. The email from two weeks ago said everything was included. The handover is in nine days.

Before you sign the order, check four things: whether the unit fits together with its safety zone, whether you get a scan of the certificate before payment, what exactly the price covers, and who the other party to the contract is. Those four questions remove most of the problems that later cost weeks of correspondence and occasionally a second purchase.

Start with the plot, not the catalogue

The usual order is the reverse: somebody finds a unit they like, calls for a price, and measures the site at the installation stage. By then it is too late, because the money has left the budget and the safety zone overlaps the kerb.

Measure the rectangle of clear space that has nothing hard in it: no fence, bench, tree, bollard, bin or kerb. Take 2 metres off every side. What is left is the real space you have for a unit. A carousel with a 1,5 m footprint therefore needs a square of about 5,5 by 5,5 m, which is over 30 square metres. What counts inside the zone and what does not is set out in the article on the playground safety zone.

The second number to establish at this stage is the free fall height. Above 60 cm, EN 1177 requires impact attenuating surfacing across the whole zone, and that is a cost which can exceed the price of the equipment. Ask for the height before you compare prices, because two units at the same price can imply budgets that differ by a large margin. The surface options are compared in the article on playground surfacing.

Ask for the certificate before you pay

On a publicly accessible site, equipment without a certificate to EN 1176 will not pass handover. A commission does not accept the explanation that the document is on its way, and an inspector has no basis on which to release the unit into service.

So ask for two things before the transfer: a scan of the certificate and a scan of the declaration of conformity. The first relates to the design that was tested, the second confirms that the unit being delivered matches that design. While you are there, check that the equipment name in the documents matches the name in the offer, because certificates sometimes cover a different model from the same family. The difference between the two documents is explained in the article on the EN 1176 certificate.

EN 1176 is a European standard, so the same certificate and declaration are the documents an inspector or a handover commission expects in the Czech Republic, in Slovakia and anywhere else the standard has been adopted. That is worth knowing if you are buying across a border and wondering whether Polish paperwork will be recognised.

What sits outside the headline price

The catalogue price and the amount you actually spend are rarely the same number. Ask directly about every line below, preferably by email, so the answer exists in writing.

Item Question for the seller What it can cost
Transport Is delivery included and how far does the courier come From nothing to a substantial sum on an oversized load
Anchors and fixings Are the components for setting the unit in the ground supplied A minor line, unless they are missing on delivery day
Foundation What dimensions and how much concrete per unit Materials for one foundation, local prices
Assembly Is it offered, how is it calculated, does it include travel Depends on the distance from the works
Surfacing What is the free fall height of the unit Nothing, or more than the equipment
Documentation Are the certificate and declaration in the price or extra Sometimes a separate line in a price list
Post-installation inspection Who carries it out and does the seller arrange it Depends on the contractor

With us, courier delivery is free across Poland and the certificate and declaration travel with every order at no extra charge. Assembly is an option priced by distance: 2,50 zł per kilometre one way from Rogowo, which you can work out in the delivery and assembly calculator. Assembly needs a concrete foundation and two people, whoever does it.

Who you are actually buying from

With equipment that has to stand for well over a decade and carry a warranty for two of them, it matters whether you are talking to the maker or to a reseller shipping somebody else's product under a label. A reseller cannot answer a question about foundation depth without phoning someone, and in a warranty claim they sit in the middle of a chain they do not control.

The check takes fifteen minutes:

  • Ask for the company registration number and tax identification number, and look the company up in the national business register of the country it operates in.
  • Ask for the address of the production works, not the correspondence address.
  • Ask a technical question only a maker can answer: wall thickness of the tube, foundation dimensions, how the bearing is mounted.
  • Ask for photographs from production or from completed installations, ideally showing the actual unit rather than a render.
  • Ask how long the company has been making this type of equipment, and for two or three sites you can look at.

For the record on our side: we have been making metal carousels and seesaws since 2011, in Rogowo 69, 87-515 Rogowo, Poland, and the person who answers the phone is the person who knows the welding.

Payment, lead time and what happens after a fault

Public buyers in most countries cannot pay in advance, so if you are purchasing for a municipality, a school or a kindergarten, the question about payment terms has to be asked during market research rather than after the offer is chosen. A seller who insists on prepayment is excluded on procedure, whatever the price. We are exempt from VAT, which changes the shape of the invoice, so it is worth confirming with your finance department how they want the document issued before the order goes in.

Check the lead time in two dimensions. The first is length: ours is 7 working days, 5 of production and 2 of transport, and a commitment like that can be required in writing in the order. The second matters more on public projects where the handover date sits in a contract. A lead time counted from the moment payment clears shifts the whole schedule by however long the internal paperwork takes, often another week. So ask directly when the clock starts: at the order or at the money.

On the warranty, ask two things nobody asks before buying and everybody asks after a fault: who pays the transport on a replacement part, and whether the manufacturer sends the component or requires the whole unit to be returned. With an oversized structure, that second answer decides whether a claim costs very little or a great deal. Our manufacturer warranty runs 2 years against material and production defects, with assembly in line with the instructions as the condition.

The checklist to work through before ordering

What to check Why Warning sign
Plot dimensions minus 2 m on every side So the unit and its zone fit on the site at all The seller cannot give the footprint of the unit
Free fall height Decides whether surfacing to EN 1177 is required The figure is not in the data sheet and nobody can supply it
Scan of the EN 1176 certificate Without it there is no handover on a public site You will get the certificate after delivery
Declaration of conformity for the specific model Ties the delivered unit to the tested design The name on the document does not match the offer
Age range and load capacity They have to match the children who will use it The product page lists only dimensions and a price
Instructions with a foundation drawing Without them the ground cannot be prepared or the work signed off The instructions are one page with no dimensions
Full cost: transport, fixings, assembly So you compare offers rather than headline prices The answer is that it will be agreed later
Lead time and when it starts running On a public project the handover date is in the contract A range given with no commitment behind it
Payment method and terms A public body will not pay before delivery Prepayment only
Warranty: scope, length, how a claim is handled On an oversized structure the handling is what costs No wording on who pays the transport
Registration details and the address of the works So you know who answers for defects in two years Only a contact form and a mobile number
Rating plate on the unit Needed at inspections and when ordering parts No confirmation that the unit carries one

When to walk away from an offer

Two answers should end the conversation whatever the price. The first is a refusal to send the certificate before payment. The second is an inability to state the free fall height, because it means the seller does not know the product they are selling and you cannot estimate the surfacing cost.

A separate case is a price that sits clearly below everything else for equipment described as certified. Testing a design, galvanising and powder coating cost every manufacturer roughly the same, so a large difference has to come from somewhere: a thinner wall, galvanising that was skipped, or documents that simply do not exist. What that buys you in the long run is covered in the article on when repair stops paying.

We answer every question on this checklist before an order, including the uncomfortable ones. The EN 1176 certificate and the declaration of conformity go out by email before payment, parameters that are not on the product page we confirm on request, and if a unit will not fit on your plot we say so before the order rather than at unloading. Call 507 440 718 or write to kontakt@bol-met.pl, daily between 08:00 and 20:00. See the range and prices, or send your plot dimensions and the ages of the children through the quotation form.

Short answers

What should I check before buying playground equipment?

Four things decide whether the purchase works: whether the unit fits together with its safety zone, whether you get a scan of the EN 1176 certificate before you pay, what the price actually covers beyond the structure itself, and who the party on the other side of the order is.

Can I ask for the certificate before buying?

Yes, and it is an ordinary question rather than an awkward one. A manufacturer has the document to hand and sends a scan within minutes. An answer along the lines of the certificate travels with the delivery is a reason to hold the transfer.

How do I tell whether the seller is the manufacturer?

Ask for the company registration and tax numbers and the address of the works rather than a correspondence address, then ask something only a maker knows: foundation depth, wall thickness of the tube, how the bearing is mounted, the production date. A reseller answers in generalities or promises to check and call back.

How much room does one unit need?

The footprint of the unit plus 2 m of clear ground on every side. Nothing hard may stand inside that zone: no fence, bench, tree or second unit.

What this is based on

  • EN 1176-1: playground equipment, general safety requirements
  • EN 1176-7: guidance on installation, inspection, maintenance and operation
  • EN 1177: impact attenuating playground surfacing

Need certified equipment?

We make carousels and seesaws in Rogowo, Poland. EN 1176 certificate and the full paperwork included, free delivery across Poland, 7 working days lead time.

Read next