Installing and maintaining playground equipment
Assembly is a job with concrete in it. What comes after is a routine that decides how long the equipment lasts.
Installing a carousel: foundation, concrete, tools and timing
A carousel is set on a concrete foundation, levelled twice and left alone until the concrete gains strength. What to prepare before delivery, how the job runs and when children can be let on.
Aktualizacja August 10, 2026 · 7 min czytania
Carousel maintenance: what to check monthly and what once a year
A working list for carousels and seesaws: tightening fastenings, judging the bearing, checking chain links and hangers, touching up the coating and looking at the foundation. With a schedule by frequency.
Aktualizacja August 10, 2026 · 8 min czytania
Assembly by your own team or by ours: cost, risk, warranty
What you actually need to install a carousel yourself, what our crew costs, which assembly mistakes fall outside the warranty and who signs off the post-installation inspection.
Aktualizacja August 10, 2026 · 7 min czytania
Playground equipment through the winter: what needs protecting
Galvanised, powder coated steel overwinters outdoors without dismantling or covering. The real problems are frozen surfacing, de-icing salt and water trapped where it can freeze. A working list of tasks.
Aktualizacja August 10, 2026 · 7 min czytania
Replacing old equipment: when repair stops paying
Four situations in which repairing a carousel cannot be defended: corrosion in a load-bearing section, no spare parts, no documentation and a design that no longer meets the standard. Plus the arithmetic that settles it.
Aktualizacja August 10, 2026 · 8 min czytania
Masz pytanie, którego tu nie ma?
Odpowiadamy codziennie 08:00–20:00, zwykle w 15 minutes.